Jaypee Lake District

Price list

S.NO. Building Type Room Type Area (sq. ft.) Booking Amount BSP* BSP* DP Plan Floor Plan
1 High Rise 2 BHK 850 2 lac 1,980,500 1,683,425 F2
2 2 BHK+W 1050 2 lac 2,446,500 2,079,525 F1
3 2 BHK+study 1200 2 lac 2,796,000 2,376,600 E2
4 3 BHK 1350 3 lac 3,145,500 2,673,675 E1
5 High Rise 2 BHK 1050 2 lac 2,446,500 2,079,525 D1
6 3 BHK 1350 3 lac 3,145,500 2,673,675 D2
7 3 BHK+W 1550 3 lac 3,611,000 3,069,775 C1
8 4 BHK 1800 4 lac 4,194,000 3,564,900 C2
9 Low/Mid Rise 3 BHK 1250 3 lac 3,250,000 2,762,500 B1
10 3 BHK+W 1450 3 lac 3,770,000 3,204,500 B2
11 3 BHK+W 1600 3 lac 4,160,000 3,536,000 A1
12 4 BHK+W 2100 4 lac 5,460,000 4,641,000 A2

  • 15 % discount on Down Payment

  • Other Applicable Charges:

    S. No. Payment Head Charges / Rate
    1 Internal Development Charges Rs. 75.00 psf
    2 Electric Sub Station Charges Rs. 40.00. psf
    3 Social Club Membership Rs. 1.00 Lac
    4 Car Parking One reserved basement car parking space compulsory with any apartment.
    Underground Car Parking
    1. Car park @ Rs 2.00 Lac
    2. Subsequent car park @ Rs. 3.50 Lac
    5 Interest Free Maintenance Deposit Rs. 50.00 psf
    6 Maintenance Advance Rs. 1.50 psf per month
    7 Preferential Location Charges* Rs. 100.00 psf (G to 5th floor)
    Rs. 60.00 psf (6th – 10th floor)
    8 One time lease rent Rs. 50.00 psf
    9 Transfer charges Rs. 25.00 psf
    * The PLC is applicable only in case of high rise apartments

    Notes:

    1. The Basic Prices are for the indicated Super area and are not inclusive of charges for the reserved car parking slot, land development charges, electric sub-station charges.

    2. The Inaugural discount can be withdrawn at the sole discretion of the company at any point of time.

    3. Additional amounts towards Stamp Duty, Registration Charges, and legal / miscellaneous expenses etc., shall be payable by the Allottee at the time of offer of possession.

    4. Maintenance charges as per maintenance agreement shall be payable by the allottee separately.
    a. The interest free Maintenance deposit @ Rs. 50.00 per sq. ft. of super area shall be payable extra before handing over possession of the premises to the allottee.
    b. Maintenance charges for the first year shall be payable in advance at the time of offer of possession @ Rs. 1.50 psf per month.

    5. Areas are indicative only.

    6. Exact super area of Apartment shall be calculated at the time of handing over possession of property as constructed. Increased / decreased area shall be charged proportionately as per the sale price.

    7. The super area means the covered area of the demised premises inclusive of the area under the periphery walls, area under columns and walls within the demised premises, half of the area of the wall common with the other premises adjoining the demised premises, cupboards, plumbing / electric shafts of the demised premises, total area of the balconies and terraces, and proportionate share of the common areas like common lobbies, lifts, common service shafts, staircases, machine room, mumty, electric sub station and other services and other common areas etc.

    8. The other terms and conditions shall be as per the Application Form, Standard Terms and Conditions and the Allotment Letter of the Company.

    9. The prices are subject to revision / withdrawal at any time without notice at the sole discretion of the Company.

    10. Government Taxes as applicable from time to time shall be payable by the allottee in addition to the sale price as stated above.

    11. Transfer fees would be @ Rs.25 per sq ft & transfer would be allowed only after 30% of the payment has been received from the allottee (subject to change, as per the company policy).


    A. Construction Linked Plan - High-Rise (G+9 to G+11)

    S.No. Payment Due On % age Other applicable charges
    1 Booking amount As applicable *
    2 On or before 2 months of the Application 20% of BSP (Less booking amount*)
    3 On or before 4 months of the Application 10% of BSP
    4 On commencement of excavation 10% of BSP
    5 On laying of upper basement slab 10% of BSP PLC Charges as applicable
    6 On laying of 3rd floor Roof Slab 8.5% of BSP
    7 On laying of 6th floor Roof Slab 8.5% of BSP IDC Charges
    8 On laying of 9th floor Roof Slab 7.5% of BSP
    9 On laying of 12th floor Roof Slab 7.5% of BSP
    10 On laying of top floor Roof Slab 7% of BSP Electric Sub Station charges
    11 On completion of internal plaster & flooring within the apartment 6% of BSP
    12 On offer of possession 5% of BSP Social Club Charges + IFMD + Lease rent + Car park charges
    TOTAL 100%

    B. Construction Linked Plan - High-Rise (G+12 to G+15)

    S. No.  Payment Due On % age Other applicable charges
    1 Booking amount As applicable *
    2 On or before 2 months of the Application 20% of BSP (Less booking amount*)
    3 On or before 4 months of the Application 10% of BSP
    4 On commencement of excavation 10% of BSP
    5 On laying of upper basement slab 10% of BSP PLC Charges as applicable
    6 On laying of 2nd floor Roof Slab 8.5% of BSP
    7 On laying of 4th floor Roof Slab 8.5% of BSP IDC Charges
    8 On laying of 6th floor Roof Slab 7.5% of BSP
    9 On laying of 9th floor Roof Slab 7.5% of BSP
    10 On laying of top floor Roof Slab 7% of BSP Electric Sub Station charges
    11 On completion of internal plaster & flooring within the apartment 6% of BSP
    12 On offer of possession 5% of BSP Social Club Charges + IFMD + Lease rent + Car park charges
    TOTAL 100%


    C. Construction Linked Plan - High-Rise (More than G+15)

    S. No.  Payment Due On % age Other applicable charges
    1 Booking amount As applicable *
    2 On or before 2 months of the Application 20% of BSP (Less booking amount*)
    3 On or before 4 months of the Application 10% of BSP
    4 On commencement of excavation 10% of BSP
    5 On laying of upper basement slab 10% of BSP PLC Charges as applicable
    6 On laying of 3rd floor Roof Slab 8.5% of BSP
    7 On laying of 6th floor Roof Slab 8.5% of BSP IDC Charges
    8 On laying of 9th floor Roof Slab 7.5% of BSP
    9 On laying of 12th floor Roof Slab 7.5% of BSP
    10 On laying of top floor Roof Slab 7% of BSP Electric Sub Station charges
    11 On completion of internal plaster & flooring within the apartment 6% of BSP
    12 On offer of possession 5% of BSP Social Club Charges + IFMD + Lease rent + Car park charges
    TOTAL 100%


    D. Construction Linked Plan - Mid-Rise (G+7 to G+8)

    S. No.  Payment Due On % age Other applicable charges
    1 Booking amount As applicable *
    2 On or before 2 months of the Application 20% of BSP (Less booking amount*)
    3 On or before 4 months of the Application 10% of BSP
    4 On commencement of excavation 10% of BSP
    5 On laying of upper basement slab 10% of BSP PLC Charges as applicable
    6 On laying of 1st floor Roof Slab 10% of BSP
    7 On laying of 3rd floor Roof Slab 8.5% of BSP IDC Charges
    8 On laying of 5th floor Roof Slab 8.5% of BSP
    9 On laying of top floor Roof Slab 9% of BSP Electric Sub Station charges
    10 On completion of internal plaster & flooring within the apartment 9% of BSP
    11 On offer of possession 5% of BSP Social Club Charges + IFMD + Lease rent + Car park charges
    TOTAL 100%


    E. Construction Linked Plan - Low-Rise (G+3 / G+5)

    S. No.  Payment Due On % age Other applicable charges
    1 Booking amount As applicable *
    2 On or before 2 months of the Application 20% of BSP (Less booking amount*)
    3 On or before 4 months of the Application 10% of BSP
    4 On commencement of excavation 10% of BSP
    5 On laying of upper basement slab 10% of BSP PLC Charges as applicable
    6 On laying of 1st floor Roof Slab 10% of BSP
    7 On laying of 3rd floor Roof Slab 10% of BSP IDC Charges
    8 On laying of top floor Roof Slab 10% of BSP Electric Sub Station charges
    9 On completion of internal plaster & flooring within the apartment 10% of BSP
    10 On offer of possession 5% of BSP Social Club Charges + IFMD + Lease rent + Car park charges
    TOTAL 100%

    * Booking Amount:

    2 BHK / 2 BHK + W / 2 BHK + study - Rs. 2.00 Lac

    3 BHK / 3 BHK + W - Rs. 3.00 Lac

    4 BHK / 4 BHK + W – Rs. 4 Lac


    Cheque should be drawn in favour of ‘JPSK SPORTS PRIVATE LIMITED’


    Notes:

    • Installments under S. No. 4 – 12 / 4-10 may run concurrently with those under S. No. 1 - 3 based on the physical progress of work at site.
    • The demand letter for Installments at S. No. 4 – 12 / 4-10 shall be sent in advance providing for payment period of up to 15 days.


    B. Down Payment Plan

    S. No.  Payment Due On % age Other applicable charges
    1 Booking amount As applicable *
    2 On or before 1 months of the Application 95% of BSP (Less booking amount*) IDC + Electric substation charges + PLC Charges as applicable
    3 On offer of possession 5% Social Club Charges + IFMD + Lease rent + Car park charges
    TOTAL 100%


    Note: Down Payment Discount: @ 15% on BSP

    Other Hot Projects

    Contact

    Your Name:

    E-mail:

    Country

    (Country Code)

    (Mobile No. Do NOT prefix '0')

    Preferable Time to Call

    to

    Message*

    Enter Code

    F.A.Q

    A. What is the approach road/connectivity/distance?

    The project site is located approximately 45 kms south east of Delhi, 15 kms south of Noida & east of the Yamuna river. It will be well connected with the Yamuna Expressway along its east boundary, Eastern Expressway on its west & ring road to South east.

    The 165 km long Yamuna expressway would connect to Agra and the Eastern expressway connects to Ghaziabad, Noida & Faridabad whereas the ring road would connect to internal regions of Greater Noida.

    Proposed metro link would run parallel to the Yamuna Expressway. The main railway between Delhi & Agra runs along the west boundary.

    B. Who are the Architects?

    The project is being designed by world renowned International Architects & Planners, WATG.

    C. What is the time of possession?

    3 years from the date of booking as per the prescribed payment plan.

    D. Is customization possible?

    No, any kind of customization is not possible.

    E. What kind of security would be provided?

    It would offer multi-tier security system with Manned Security at the periphery of the complex and Access Control at the entry / exit gate of the complex.

    F. What is the provision for water & power back up?

    24x7 water & power back up will be provided. The power generation would be through Jaypee Group’s own electricity generation plant.

    G. Who will maintain the common area? Do I pay anything upfront towards common area charges?

    The common areas/services will be maintained by a designated Maintenance Agency on payment of maintenance charges.

    The Interest Free Maintenance Deposit is applicable, as per the payment plan.

    One year charges will have to be paid in advance at the time of handover. Also PDC’s for 2 years monthly maintenance would be payable at the time of handover.

    Jaypee Lake District